Contract - November/December 2011 - (Page 86)

1. hoT bATh 2. SAUnA 4 3. Pool 4. heATed FloorS 1 3 5. decking 2 5 combined Sundeck and Promenade level Floor Plan 3 architecte + architect adresse de l'architecte + architect address projet + project adresse du projet + project address client adresse du client + client address no dessin + draw 75 RUE QUEEN_#1400_MONTRÉAL_QC_H3C 2N6_T.514.282.6834_F.514.282.0499 BOTA BOTA_SPA SUR L’EAU 358 DE LA COMMUNE_MONTRÉAL_QC 6 358 DE LA COMMUNE_MONTRÉAL_QC_MONTRÉAL_QC DANIEL ÉMOND 3/32’’=1’-0’’ PONT PROMENADE 7 6. originAl dock 7. boArding dock 8. TreATMenT rooMS 9. MAin STAirS 10. loUnge 11. biSTro 10 11 9 8 architecte + architect dock and Main level Floor Plan adresse de l'architecte + architect address projet + project adresse du projet + project address client adresse du client + client address no dessin + drawing id 75 RUE QUEEN_#1400_MONTRÉAL_QC_H3C 2N6_T.514.282.6834_F.514.282.0499 BOTA BOTA_SPA SUR L’EAU 358 DE LA COMMUNE_MONTRÉAL_QC 358 DE LA COMMUNE_MONTRÉAL_QC_MONTRÉAL_QC DANIEL ÉMOND 3/32’’=1’-0’’ PONT PRINCIPAL fabricated to precise specification to not waste space. Unnecessary machinery from when the ship used to operate was removed to make way for guest locker rooms. Adding more floors, however, posed the next challenge—keeping the boat afloat despite an increase in volume. The team consulted naval engineers to learn more about flotation, and then devised their own plan for buoyancy. “Any time you build a prototype in architecture, you have to embed the learning curve as you’re doing it. So we had to twist and turn to design from these findings,” says Pelland. Those adjustments were largely material substitutions to decrease weight. For instance, a thick layer of poured concrete for heated floors was tweaked to a 1½-inch-thick Styrofoam substrate through which heated pipes run, a thinner layer of lightweight concrete, and ceramic tiling on top. Thin steel was used for the porthole panels. The designers specified residential glass and aluminum guardrails for the deck zones, as opposed to the thicker commercial-grade product. And instead of wood, the team used narrow-gauge steel for the lockers. Two buoys, running the length of the ship on either side, assist in floatation. Finally, there was an issue of regulating temperature. Montreal is notorious for its cold winters, so the skin of 670 portholes had to be strategically implemented. The solution was to prefabricate the port- geothermal loop The main staircase (opposite, top) features a mesh guardrail and maple stair treads. It provides access to the Pont Soleil (top level sundeck), where guests enjoy terraces, pools and baths, and the sauna. A freeform pool (opposite, bottom) offers city views; the adjacent tiled floor covers a heated concrete-andstyrofoam substrate. In the geothermal loop (above), the coil extends into the water below the boat. 86 contract november/december 2011 www.contractdesign.com http://www.contractdesign.com

Table of Contents for the Digital Edition of Contract - November/December 2011

Contract - November/December 2011
Contents
Editorial
Industry News
Product Briefs
Product Focus: Classic Touch
Product Focus: Generating Buzz(i)
Gelfand Partners Architects Office in San Francisco Designed by Gelfand Partners Architects
Sorg Architects Office in Washington, D.C. Designed by Sorg Architects
Sauerbruch Hutton Office in Berlin, Germany Designed by Sauerbruch Hutton
Roth Sheppard Architects Office in Denver Designed by Roth Sheppard Architects
AOL West Coast Headquarters in Palo Alto, California Designed by Studio O+A
Red Bull Canada Office Expansion in Toronto, Ontario, Canada Designed by Johnson Chou Inc.
Goods Shed North in Melbourne, Australia Designed by BVN Architecture
Bota Bota Spa in Montreal, Quebec, Canada Designed by Sid Lee Architecture
A’maree’s in Newport Beach, California Designed by Paul Davis Architects
2011 Contract Brand Report Awareness Survey
Sources
Designers Select: Building Products
Ad Index
Perspectives

Contract - November/December 2011

https://www.nxtbook.com/nxtbooks/contract/201405
https://www.nxtbook.com/nxtbooks/contract/201404
https://www.nxtbook.com/nxtbooks/contract/201403
https://www.nxtbook.com/nxtbooks/contract/iida_red2014
https://www.nxtbook.com/nxtbooks/contract/201401
https://www.nxtbook.com/nxtbooks/nielsen/contract_201312
https://www.nxtbook.com/nxtbooks/nielsen/contract_201311
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310_v2
https://www.nxtbook.com/nxtbooks/nielsen/contract_201309
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708_neocon_supplement
https://www.nxtbook.com/nxtbooks/nielsen/contract_201306
https://www.nxtbook.com/nxtbooks/nielsen/contract_201305
https://www.nxtbook.com/nxtbooks/nielsen/contract_201304
https://www.nxtbook.com/nxtbooks/nielsen/contract_201303
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130102
https://www.nxtbook.com/nxtbooks/nielsen/contract_201212
https://www.nxtbook.com/nxtbooks/nielsen/contract_201211
https://www.nxtbook.com/nxtbooks/nielsen/contract_201210
https://www.nxtbook.com/nxtbooks/nielsen/contract_201209
https://www.nxtbook.com/nxtbooks/nielsen/contract_ncw_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201206
https://www.nxtbook.com/nxtbooks/nielsen/contract_201205
https://www.nxtbook.com/nxtbooks/nielsen/contract_201204
https://www.nxtbook.com/nxtbooks/nielsen/contract_201203
https://www.nxtbook.com/nxtbooks/nielsen/contract_20120102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20111112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201110
https://www.nxtbook.com/nxtbooks/nielsen/contract_201109
https://www.nxtbook.com/nxtbooks/nielsen/contract_2011neoconwinners
https://www.nxtbook.com/nxtbooks/nielsen/contract_201108
https://www.nxtbook.com/nxtbooks/nielsen/contract_201106
https://www.nxtbook.com/nxtbooks/nielsen/contract_201105
https://www.nxtbook.com/nxtbooks/nielsen/contract_201104
https://www.nxtbook.com/nxtbooks/nielsen/contract_201103
https://www.nxtbook.com/nxtbooks/nielsen/contract_20110102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20101112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201010
https://www.nxtbook.com/nxtbooks/nielsen/contract_201009
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100708
https://www.nxtbook.com/nxtbooks/nielsen/contract_201006
https://www.nxtbook.com/nxtbooks/nielsen/contract_201005
https://www.nxtbook.com/nxtbooks/nielsen/contract_201004
https://www.nxtbook.com/nxtbooks/nielsen/contract_201003
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100102
https://www.nxtbook.com/nxtbooks/nielsen/contract_200911
https://www.nxtbook.com/nxtbooks/nielsen/contract_200909
https://www.nxtbook.com/nxtbooks/nielsen/contract_200910
https://www.nxtbook.com/nxtbooks/nielsen/contract_200908
https://www.nxtbook.com/nxtbooks/nielsen/contract_200907
https://www.nxtbook.com/nxtbooks/nielsen/contract_200906
https://www.nxtbook.com/nxtbooks/nielsen/contract_200905
https://www.nxtbook.com/nxtbooks/nielsen/contract_200904
https://www.nxtbook.com/nxtbooks/nielsen/contract_200903
https://www.nxtbook.com/nxtbooks/nielsen/contract_200902
https://www.nxtbook.com/nxtbooks/nielsen/contract_200901
https://www.nxtbookmedia.com